| Class: | 4+ | ||
| Flow: | 11cms | ||
| Length: | 3km | ||
| Time: | 2 hr | ||
| Portages: | 1 | ||
| Gradient: | 5-6 % | ||
| Season: | Spring or Heavy Rain | ||
| Put-In: | Logging bridge above pipline | ||
| Take-Out: | Pipeline |
Run description:
This section is a fun class 3-3+ section with one mandatory portage in the middle. At highway bridge wtahc for wood, thing are slow at the start but pick up and are extermely fun.
Other runs on the Heber River: