DISCLAIMER
Class: 4+
Flow: 11cms
Length: 3km
Time: 2 hr
Portages: 1
Gradient: 5-6 %
Season: Spring or Heavy Rain
Put-In: Logging bridge above pipline
Take-Out: Pipeline

Run description:

This section is a fun class 3-3+ section with one mandatory portage in the middle. At highway bridge wtahc for wood, thing are slow at the start but pick up and are extermely fun.

Other runs on the Heber River: